26.07.23_Pusiko Civil

1:32:40 5 Speakers 20 Poglavlja 1786 segmenti

Poglavlja

  1. 0:05

    Did you make a last minute change to make the meeting here? Oh, maybe this one is not included in the shape that we see. It wasn't? Yeah, we have to do this yesterday before we take that. Okay, that's alright, that's good. So, Jeff Johnson …

  2. 5:06

    I forwarded you the legal survey information, right? Yeah, I forwarded that. Right, so that should be what's going on back here. Yeah. Right? Yeah, that it is. That is the reason this is not matching agency is the point here. I remember, ye…

  3. 10:03

    I don't know if I can connect to that at all. And go to say drawing R0. 3589 -3R0. 3. Oh, this is 3. I think I'll have a figure. Figure 3. Oh, no, we should be drawing 3, not figure. Yeah, this would be drawing. I don't know why it came in …

  4. 15:06

    it's like where is your there's no where's your gutter lines here there's no gutter lines right you're missing information like if you go then to later drawing of one of those um let's see which one drawing uh three five two four dash zero …

  5. 25:00

    to really come start building right and then while they're not no longer need the impact here so yeah um just a source of the hatching build just a wall maybe two meter three meter fuel the excess way to lift each station whatever yeah yeah…

  6. 35:09

    So sanitary, we're not doing this, right? Where are we stopping? Are we going to just like do that, cap it there? Yeah, we could. Within the rough grading? Yeah. Yeah, exactly. The whole part is dirty. But remember that's a pretty steep are…

  7. 40:00

    And what's this line here? Is this that rough grading line? That is 300. But why is that here not shown anywhere else? It is all through, maybe in some seats it was all through. Are you guys working out the same base plans? On the same base…

  8. 45:02

    well right now you're telling them they got a cut yeah from here to here so that's six meters right but what's the bottom of that trench Like what are the trenching details? Where's your pipe? Here's your pipe. You know, finish grade. Well,…

  9. 50:05

    we need to know that's going to be shown somewhere like someone how the contractors got we want them to install the conduit right that conduit's going to be done by this contractor right so we need that information You've got your lift stat…

  10. 55:00
    Poglavlje 12: This one? 278s · Speaker 3

    This one? This one is like a joint use utility corridor. Yeah. That gives us the alignment element. Yeah. No, no, no. Nobody gave us this. I just proposed it. We need the alignment to know where to put all those lines. No purpose. I just di…

  11. 59:38

    Okay? Then call me and we'll walk through those together. Okay? Then we'll focus in on the planning profiles. Okay? So that way we're not sending 100 drawings at once. We can focus in on the 10, 12 drawings and get them going from that pers…

  12. 1:04:39
    Poglavlje 14: the better? 300s · Speaker 1

    the better? Well, again, if you look at that Safford drawing, they had one drawing, right? Yeah. It's a short, it's not like this. It's just a straight section. It's like a boom, boom. Here we have the loop and the curve. So you might need,…

  13. 1:09:39

    into the area itself.

  14. 1:10:51

    this is where we're coming from right we're coming into here right and we're going to be tying into here right that's right that like that's all like where our work right now the way you have it we're stopping the road right about here tyin…

  15. 1:15:52

    But they should show up on the plan. Okay. Right? They should show up on the plan. Come back to this drawing here. This should be mill and fill. Right? Salvage curve here, right? New sidewalks, right? Tying the new sidewalk there. Tying tha…

  16. 1:20:59

    i'm i'm not sure i understand so we're coming in with 750 here right right right 750 And on the side of that existing, this is the new manual? Yes, existing manual, that's it. This is the existing manual. Are we replacing that? Yeah, we'll …

  17. 1:26:11

    You gave us some PDF. Do you have a specific one that you like or you just want us to go through the whole thing? Of the projects? Yes, the PDF you shared with us, the projects. Do you like the specific one that you want us to just follow? …

  18. 1:31:12

    I know, I know. Go with that for now. Go with KEDC. Yeah, that makes sense, because we are talking about executive officer. Right. There's two CEOs, right? George Levent, CEO of KTC. Ted Bland, CEO of Canadian Economic Development Corps. Ac…