The transcript discusses a system for processing raw materials into alternative fuel, including the use of a preheater to heat the material to a specific temperature before it is used in a power plant. The process involves grinding and powdering the material, and the system is designed to replace coal in the cement industry.
章次 章 次
-
0:15章章章 章章 章 次 第一章 章 第一章 一章 1: There is a four-offer. 303s · Speaker 1
There is a four-offer. So that is for raw meal purpose? Thank you. So, basically, I will maintain this. So, basically, I will maintain this. So, basically, I will maintain this. So, basically, I will maintain this. So, basically, I will mai…
-
5:19章章章 章章 章 次 第一章 章 第一章 一章 2: it will come to us. 305s · Speaker 1
it will come to us. But then the power plant is not used for it? No, it is used for it. It is used for it. It is used for it. It is used for it. It is used for it. It is used for it. It is used for it. It is used for it. It is used for it. …
-
10:35章章章 章章 章 次 第一章 章 第一章 一章 3: How much percentage in the mix? 263s · Speaker 2
How much percentage in the mix? No, not in the mix. I have two balls in the mix. This is your office. Iqp is for the final product. Iqp is for the final product. In the initial setting time, the anal setting time, and the blend. These are f…
-
15:00章章章 章章 章 次 第一章 章 第一章 一章 4: foreign foreign If we don't change both, then we are always concerned. 72s · Speaker 3
foreign foreign If we don't change both, then we are always concerned. So if there is something change over, as and when? Yes. So who will change the bomb? I will change the bomb. I will change the bomb. I will change the bomb. I will chang…
-
16:12章章章 章章 章 次 第一章 章 第一章 一章 5: I have a parameter to fix. 300s · Speaker 4
I have a parameter to fix. Clean gun, gypsum, grinding. That is fixed, standard fixed. With the standard, I will go to monthly where there is a division and why. We can track the cost in the seat. Can we show some samples? No, I can show so…
-
21:12章章章 章章 章 次 第一章 章 第一章 一章 6: Okay, it's 2 -0. 301s · Speaker 1
Okay, it's 2 -0. PPC is 54 % and 46 % is OPC. So, our ship is single constructed ship. Product -wise, it doesn't. Product -wise, it doesn't. But my tracking is single. This is a query. In the query, we have dumped the dump. Then we have to …
-
26:13章章章 章章 章 次 第一章 章 第一章 一章 7: What is the load point on the load point? 224s · Speaker 1
What is the load point on the load point? The maximum is the maximum. The maximum is the maximum. The maximum is the maximum. The maximum is the maximum. The maximum is the maximum. It depends on which material you get. Unloading time, how …
-
30:01章章章 章章 章 次 第一章 章 第一章 一章 8: If S is more than 28 % but less than 30 % then 5 % will be deducted. 61s · Speaker 2
If S is more than 28 % but less than 30 % then 5 % will be deducted. The second clause is CVPO. CV is much less than a deducted. So, as per SOP or PO is defined, it depends on all of them. The third party report and third party report will …
-
31:03章章章 章章 章 次 第一章 章 第一章 一章 9: you talking about this? 129s · Speaker 3
you talking about this? We are talking about MBR, August MBR. We will discuss some changes. He said, I'll show you later. I'll show you later. I'll show you later. I'll show you later. I'll show you later. I'll show you later. I'll show you…
-
33:13章章章 章章 章 次 第一章 章 第一章 一章 10: If you are talking about the loader, then it will be 0 . 293s · Speaker 6
If you are talking about the loader, then it will be 0 .06L per ton. Okay. So, the amount of material is multiplied by 0 .06L per ton. If it is more expensive, then it will be more expensive, then it will be more expensive, then it will be …
-
38:21章章章 章章 章 次 第一章 章 第一章 一章 11: And MBR is required. 110s · Speaker 1
And MBR is required. MBR? MBR versus actual accounts? Yes, I will talk about it. What data did you get? July 25 to June 26. What is the name of R .A .M .A.? We have two recipes. Raw mix and OPC -PPC. Bomb bomb. Bomb bomb. Bomb bomb bomb bom…